FantasticSearch

Scroll to: TopResults

Explore European Union Legislation by Asking a Legal Question

assisted-checkbox

filter-instruction-1
positive-filters
negative-filters
act-filter tabs-all

parameters-title

query

assisted-checkbox:

result-title

total 2

Regulation (EU) No 229/2013 of the European Parliament and of the Council of 13 March 2013 laying down specific measures for agriculture in favour of the smaller Aegean islands and repealing Council Regulation (EC) No 1405/2006

article  14

CELEX:  32013R0229

Controls and penalties
1. The agricultural products which are the subject of the specific supply arrangements shall be subject to administrative checks at the time that they enter the smaller islands as well as when they are exported or dispatched. The Commission shall adopt implementing acts concerning the minimum characteristics of the checks to be carried out by Greece. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22(2).
2. Except in cases of force majeure or exceptional climatic conditions, if an operator, as referred to in Article 11, fails to comply with the commitments made in accordance with that Article, the competent authority, without prejudice to any penalties applicable under national law, shall:
(a) recover the advantage granted to the operator;
(b) temporarily suspend or revoke the operator's registration, depending on the seriousness of the non-compliance.
Regulation (EU) No 229/2013 of the European Parliament and of the Council of 13 March 2013 laying down specific measures for agriculture in favour of the smaller Aegean islands and repealing Council Regulation (EC) No 1405/2006

article  14

CELEX:  32013R0229

3. Except in cases of force majeure or exceptional climatic conditions, where operators, as referred to in Article 11, do not carry out the planned entry, their entitlement to apply for certificates shall be suspended by the competent authority for a period of 60 days following expiry of that certificate. After the suspension period, the issue of subsequent certificates shall be subject to the lodging of a security equal to the amount of the advantage to be granted during a period to be determined by the competent authority. The competent authority shall adopt the measures required to reutilise any quantities of products made available as a result of non-execution, partial execution or cancellation of the certificates issued or recovery of the advantage.