FantasticSearch

Scroll to: TopResults

Explore European Union Legislation by Asking a Legal Question

assisted-checkbox

filter-instruction-1
positive-filters
negative-filters
act-filter tabs-all

parameters-title

query

assisted-checkbox:

result-title

total 2

Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC Text with EEA relevance

article  annex_XIII

CELEX:  02012L0027-20230504

Minimum items to be included in energy performance contracts with the public sector or in the associated tender specifications — Clear and transparent list of the efficiency measures to be implemented or the efficiency results to be obtained.
— Guaranteed savings to be achieved by implementing the measures of the contract.
— Duration and milestones of the contract, terms and period of notice.
— Clear and transparent list of the obligations of each contracting party.
— Reference date(s) to establish achieved savings.
— Clear and transparent list of steps to be performed to implement a measure or package of measures and, where relevant, associated costs.
— Obligation to fully implement the measures in the contract and documentation of all changes made during the project.
— Regulations specifying the inclusion of equivalent requirements in any subcontracting with third parties.
— Clear and transparent display of financial implications of the project and distribution of the share of both parties in the monetary savings achieved (i.e. remuneration of the service provider).
Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC Text with EEA relevance

article  annex_XIII

CELEX:  02012L0027-20230504

— Clear and transparent provisions on measurement and verification of the guaranteed savings achieved, quality checks and guarantees.
— Provisions clarifying the procedure to deal with changing framework conditions that affect the content and the outcome of the contract (i.e. changing energy prices, use intensity of an installation).
— Detailed information on the obligations of each of the contracting party and of the penalties for their breach.