FantasticSearch

Scroll to: TopResults

Explore European Union Legislation by Asking a Legal Question

assisted-checkbox

filter-instruction-1
positive-filters
negative-filters
act-filter tabs-all

parameters-title

query

assisted-checkbox:

result-title

total 2

Regulation (EU) 2016/2031 of the European Parliament of the Council of 26 October 2016 on protective measures against pests of plants, amending Regulations (EU) No 228/2013, (EU) No 652/2014 and (EU) No 1143/2014 of the European Parliament and of the Council and repealing Council Directives 69/464/EEC, 74/647/EEC, 93/85/EEC, 98/57/EC, 2000/29/EC, 2006/91/EC and 2007/33/EC

article  92

CELEX:  02016R2031-20250105

Inspections and withdrawal of authorisation
1. The competent authority shall carry out inspections at least once per year, and sampling and testing if appropriate, to verify whether the authorised operators comply with Article 83(1), (2), (4) or (5), Article 87, Article 88, Article 89(1), Article 90 or Article 93(1), (2), (3) or (5).
2. Where the competent authority becomes aware that an authorised operator does not comply with the provisions referred to in paragraph 1 or that a plant, plant product or other object, for which that professional operator has issued a plant passport, does not comply with Article 85 or, where applicable, Article 86, that authority shall without delay take the measures necessary to ensure that non-compliance with those provisions does not continue. Those measures may include the withdrawal of the authorisation to issue plant passports for the plants, plant products and other objects concerned.
Regulation (EU) 2016/2031 of the European Parliament of the Council of 26 October 2016 on protective measures against pests of plants, amending Regulations (EU) No 228/2013, (EU) No 652/2014 and (EU) No 1143/2014 of the European Parliament and of the Council and repealing Council Directives 69/464/EEC, 74/647/EEC, 93/85/EEC, 98/57/EC, 2000/29/EC, 2006/91/EC and 2007/33/EC

article  92

CELEX:  02016R2031-20250105

3. Where the competent authority has taken measures in accordance with paragraph 2 other than the withdrawal of the authorisation to issue plant passports for the plants, plant products and other objects concerned, and non-compliance with Article 85 or, where applicable, Article 86 continues, that authority shall without delay withdraw that authorisation.