Regulation (EU) 2024/1789 of the European Parliament and of the Council of 13 June 2024 on the internal markets for renewable gas, natural gas and hydrogen, amending Regulations (EU) No 1227/2011, (EU) 2017/1938, (EU) 2019/942 and (EU) 2022/869 and Decision (EU) 2017/684 and repealing Regulation (EC) No 715/2009 (recast) (Text with EEA relevance)

article  70

CELEX:  32024R1789

Adoption of network codes and guidelines
1. The Commission may, subject to the empowerments laid down in Articles 71 to 74, adopt delegated or implementing acts. Such acts may either be adopted as network codes on the basis of text proposals developed by the ENTSO for Gas or the ENNOH, or, where so provided for in the priority list established pursuant to Article 71(3), by the EU DSO entity, where relevant in cooperation with the ENTSO for Gas, the ENNOH and ACER, pursuant to the procedure laid down in Articles 71, 72 and 73, or as guidelines pursuant to the procedure laid down in Article 74.
2. The network codes and guidelines shall:
(a) provide the minimum degree of harmonisation required to achieve the objectives of this Regulation;
(b) take into account regional specificities, where appropriate;
(c) not go beyond what is necessary for the purposes of point (a); and (d) apply to all interconnection points within the Union and entry points from and exit points to third countries from 5 August 2026.
Regulation (EU) 2024/1789 of the European Parliament and of the Council of 13 June 2024 on the internal markets for renewable gas, natural gas and hydrogen, amending Regulations (EU) No 1227/2011, (EU) 2017/1938, (EU) 2019/942 and (EU) 2022/869 and Decision (EU) 2017/684 and repealing Regulation (EC) No 715/2009 (recast) (Text with EEA relevance)

article  70

CELEX:  32024R1789

3. Until 5 February 2026, regulatory authorities may submit a request to the Commission for a derogation from the application of the network codes and guidelines referred to in paragraph 1 at entry points from and exit points to third countries pursuant to paragraph 2, point (d). The request for a derogation shall be submitted simultaneously to the Commission and to ACER. Within three months of the date of receipt of the request for a derogation ACER shall provide a reasoned opinion to the Commission. The Commission shall adopt a decision on the request for a derogation, taking into account ACER’s reasoned opinion and after assessing whether the regulatory authority has:
(a) demonstrated that a network code or guideline, or specific element of those acts, cannot be effectively implemented at entry points from and exit points to third countries; in the case of interconnection points with third countries which have the obligation to adapt to the Union energy acquis, including this Regulation, pursuant to an agreement concluded between the Union and those third countries, but where application or implementation has not been completed, the request for a derogation shall specify which provisions of this Regulation have not been effectively applied or implemented in the third country concerned or which technical rules or lack of technical rules in the third country impede the application of the specific provisions of the relevant network code or guideline;
(b) explained which measures were taken to alleviate the obstacles to the application of the specific provisions of the relevant network code or guideline;
(c) demonstrated that the derogation is not detrimental to the proper functioning of the internal market for natural gas, or to the security of supply of the Union or of a Member State. The derogation shall be limited to the specific provisions that cannot be effectively implemented and shall be granted for a limited period of time.