FantasticSearch

Scroll to: TopResults

Explore European Union Legislation by Asking a Legal Question

assisted-checkbox

filter-instruction-1
positive-filters
negative-filters
act-filter tabs-all

parameters-title

query

assisted-checkbox:

result-title

total 1

Directive 2012/34/EU of the European Parliament and of the Council of 21 November 2012 establishing a single European railway area (recast) Text with EEA relevance

article  35

CELEX:  02012L0034-20190101

Performance scheme
1. Infrastructure charging schemes shall encourage railway undertakings and the infrastructure manager to minimise disruption and improve the performance of the railway network through a performance scheme. This scheme may include penalties for actions which disrupt the operation of the network, compensation for undertakings which suffer from disruption and bonuses that reward better-than-planned performance.
2. The basic principles of the performance scheme as listed in point 2 of Annex VI shall apply throughout the network.
3. The Commission shall be empowered to adopt delegated acts in accordance with Article 60 concerning amendments to point 2(c) of Annex VI. Thus point 2(c) of Annex VI, may be amended in the light of the evolution of the rail market and experience gained by regulatory bodies referred to in Article 55, infrastructure managers and railway undertakings. Such amendments shall adapt the classes of delay to the best practices developed by industry.