Explore European Union Legislation by Asking a Legal Question
assisted-checkbox
filter-instruction-1
positive-filters
negative-filters
act-filter tabs-all
parameters-title
query
assisted-checkbox: ✅
result-title
total 2
Directive 2014/47/EU of the European Parliament and of the Council of 3 April 2014 on the technical roadside inspection of the roadworthiness of commercial vehicles circulating in the Union and repealing Directive 2000/30/EC Text with EEA relevance article annex_I CELEX: 02014L0047-20220927 ELEMENTS OF THE RISK RATING SYSTEM
The risk rating system shall provide the basis for a targeted selection of vehicles operated by undertakings with a poor record concerning compliance with vehicle maintenance and roadworthiness requirements. It shall take into account results from both periodic roadworthiness tests and technical roadside inspections.
The risk rating System shall consider the following parameters for determining a risk rating for the undertaking concerned:
— number of deficiencies
— severity of deficiencies
— number of technical roadside inspections or periodic and voluntary roadworthiness tests
— time factor
1. The deficiencies shall be weighted according to their severity, using the following severity factors:
— Dangerous deficiency= 40
— Major deficiency= 10
— Minor deficiency= 1
2. The evolution of an undertaking’s (vehicle’s) situation shall be reflected by applying a lower weighting to ‘older’ inspection results (deficiencies) than to more ‘recent’ ones, using the following factors:
— Year 1 = last 12 months = factor 3
— Year 2 = months 13-24 = factor 2
— Year 3 = months 25-36 = factor 1 |
Directive 2014/47/EU of the European Parliament and of the Council of 3 April 2014 on the technical roadside inspection of the roadworthiness of commercial vehicles circulating in the Union and repealing Directive 2000/30/EC Text with EEA relevance article annex_I CELEX: 02014L0047-20220927 This shall only apply for the calculation of the overall risk rating. 3. The risk rating shall be calculated using the following formulas: (a) The formula for the overall risk rating: Where RR = overall risk rating score DYi = total for the defects in year 1, 2, 3 DY1 = in year 1 #… = number of… DD = dangerous deficiencies MaD = major deficiencies MiD = minor deficiencies C = checks (technical roadside inspections or periodic and voluntary roadworthiness tests) in year 1, 2, 3
(b) The formula for the annual risk rating: Where AR = annual risk score #… = number of… DD = dangerous deficiencies MaD = major deficiencies MiD = minor deficiencies C = checks (technical roadside inspections or periodic and voluntary roadworthiness tests)
The annual risk shall be used to assess the evolution of an undertaking over the years.
The classification of undertakings (vehicles) based on the overall risk rating shall be performed in such a way that the following distribution within the listed undertakings (vehicles) is reached:
— < 30 % low risk
— 30-80 % medium risk
— > 80 % high risk. |