Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (recast) (Text with EEA relevance)

article  14

CELEX:  02010L0075-20240804

1. Member States shall ensure that the permit includes all measures necessary to comply with the requirements of Articles 11 and 18. To that effect, Member States shall ensure that permits are granted further to consultation of all relevant authorities with a responsibility regarding compliance with Union environmental legislation, including with environmental quality standards. ◄ Those measures shall include at least the following:
(a) emission limit values for polluting substances listed in Annex II to Regulation (EC) No 166/2006, and for other polluting substances, which are likely to be emitted from the installation concerned in significant quantities, having regard to their nature, their hazardousness and their potential to transfer pollution from one medium to another, taking into account the variation of water flow dynamics in receiving water bodies;
(aa) environmental performance limit values in accordance with Article 15(4);
(ab) appropriate requirements ensuring the assessment of the need to prevent or reduce the emissions of substances fulfilling the criteria of Article 57 or substances addressed in restrictions in Annex XVII to regulation (EC) No 1907/2006;
(b) appropriate requirements ensuring protection of the soil, groundwater, surface water and catchment areas for abstraction points of water intended for human consumption as referred to in Article 7 of Directive (EU) 2020/2184, and measures concerning the monitoring and management of waste generated by the installation;
(ba) appropriate requirements laying down the characteristics of an environmental management system in accordance with Article 14a;
(bb) suitable monitoring requirements for the consumption and reuse of resources such as energy, water and raw materials;
(c) suitable emission monitoring requirements specifying:
(i) measurement methodology, frequency and evaluation procedure; and (ii) where Article 15(3)(b) is applied, that results of emission monitoring are available for the same periods of time and reference conditions as for the emission levels associated with the best available techniques;
(d) an obligation to supply the competent authority regularly, and at least annually, with:
(i) information on the basis of results of emission monitoring referred to in point (c) and other required data that enables the competent authority to verify compliance with the permit conditions; and (ii) where Article 15(3)(b) is applied, a summary of the results of emission monitoring which allows a comparison with the emission levels associated with the best available techniques;
(iii) information on progress towards fulfilment of the environmental policy objectives referred to in Article 14a;
(e) appropriate requirements for the regular maintenance and surveillance of measures taken to prevent emissions to soil, surface and groundwater pursuant to point (b), and appropriate requirements concerning the periodic monitoring of soil, surface and groundwater in relation to relevant hazardous substances likely to be found on site and having regard to the possibility of soil, surface and groundwater contamination at the site of the installation;
(f) measures relating to conditions other than normal operating conditions such as start-up and shut-down operations, leaks, malfunctions, momentary stoppages and definitive cessation of operations;
(g) provisions on the minimisation of long-distance or transboundary pollution;
(h) conditions for assessing compliance with the emission limit values and environmental performance limit values or a reference to the applicable requirements specified elsewhere.
Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (recast) (Text with EEA relevance)

article  14

CELEX:  02010L0075-20240804

2. For the purpose of paragraph 1(a), emission limit values may be supplemented or replaced by equivalent parameters or technical measures ensuring an equivalent level of environmental protection.
3. BAT conclusions shall be the reference for setting the permit conditions.
4. Without prejudice to Article 18, the competent authority may set stricter permit conditions than those achievable by the use of the best available techniques as described in the BAT conclusions. Member States may establish rules under which the competent authority may set such stricter conditions.
Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (recast) (Text with EEA relevance)

article  14

CELEX:  02010L0075-20240804

5. Where the competent authority sets permit conditions on the basis of a best available technique not described in any of the relevant BAT conclusions, it shall ensure that:
(a) that technique is determined by giving special consideration to the criteria listed in Annex III; and (b) the requirements of Article 15 are complied with. Where the BAT conclusions referred to in the first subparagraph do not contain emission levels associated with the best available techniques, the competent authority shall ensure that the technique referred to in the first subparagraph ensures a level of environmental protection equivalent to the best available techniques described in the BAT conclusions.
Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) (recast) (Text with EEA relevance)

article  14

CELEX:  02010L0075-20240804

6. Where an activity or a type of production process carried out within an installation is not covered by any of the BAT conclusions or where those conclusions do not address all the potential environmental effects of the activity or process, the competent authority shall, after prior consultations with the operator, set the permit conditions on the basis of the best available techniques that it has determined for the activities or processes concerned, by giving special consideration to the criteria listed in Annex III.
7. For installations referred to in point 6.6 of Annex I, paragraphs 1 to 6 of this Article shall apply without prejudice to the legislation relating to animal welfare.