Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 Permit-granting procedure in renewables acceleration areas
1. Member States shall ensure that the permit-granting procedure referred to in Article 16(1) shall not exceed 12 months for renewable energy projects in renewables acceleration areas. However, in the case of offshore renewable energy projects, the permit-granting procedure shall not exceed two years. Where duly justified on the ground of extraordinary circumstances, Member States may extend either of those periods by up to six months. Member States shall inform the project developer clearly of the extraordinary circumstances that justify such an extension. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 2. The permit-granting procedure for the repowering of renewable energy power plants, for new installations with an electrical capacity of less than 150 kW, for co-located energy storage, including power and thermal facilities, as well as for their grid connection, where located in renewables acceleration areas, shall not exceed six months. However, in the case of offshore wind energy projects, the permit-granting procedure shall not exceed 12 months. Where duly justified on the ground of extraordinary circumstances, such as on grounds of overriding safety reasons where the repowering project has a substantial impact on the grid or on the original capacity, size or performance of the installation, Member States may extend the six-month period by up to three months and the 12-month period for offshore wind energy projects by up to six months. Member States shall inform the project developer clearly about the extraordinary circumstances that justify such an extension. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 3. Without prejudice to paragraphs 4 and 5 of this Article, by way of derogation from Article 4(2) of and Annex II, points 3(a), (b), (d), (h), (i), and 6(c), alone or in conjunction with point 13(a), to Directive 2011/92/EU, with regard to renewable energy projects, new applications for renewable energy plants, including plants combining different types of renewable energy technology and the repowering of renewable energy power plants in designated renewables acceleration areas for the relevant technology and co-located energy storage, as well as the connection of such plants and storage to the grid, shall be exempt from the requirement to carry out a dedicated environmental impact assessment pursuant to Article 2(1) of Directive 2011/92/EU, provided that those projects comply with Article 15c(1), point (b), of this Directive. That derogation shall not apply to projects which are likely to have significant effects on the environment in another Member State or where a Member State that is likely to be significantly affected so requests, pursuant to Article 7 of Directive 2011/92/EU. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 By way of derogation from Article 6(3) of Directive 92/43/EEC, the renewable energy plants referred to in the first subparagraph of this paragraph, shall not be subject to an assessment of their implications for Natura 2000 sites provided that those renewable energy projects comply with the rules and measures established in accordance with Article 15c(1), point (b), of this Directive. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 4. The competent authorities shall carry out a screening process of the applications referred to in paragraph 3 of this Article. Such a screening process shall aim to identify if any of the renewable energy projects is highly likely to give rise to significant unforeseen adverse effects in view of the environmental sensitivity of the geographical areas where they are located, which were not identified during the environmental assessment of the plans designating renewables acceleration areas referred to in Article 15c(1), first subparagraph, of this Directive carried out pursuant to Directive 2001/42/EC and, where relevant, to Directive 92/43/EEC. Such a screening process shall also aim to identify if any of such renewable energy projects falls within the scope of Article 7 of Directive 2011/92/EU due to its likelihood of significant effects on the environment in another Member State or due to the request of a Member State which is likely to be significantly affected. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 For the purpose of such a screening process, the project developer shall provide information on the characteristics of the renewable energy project, on its compliance with the rules and measures identified pursuant to Article 15c(1), point (b), for the specific renewables acceleration area, on any additional measures adopted by the project developer, and on how those measures address environmental impact. The competent authority may request the project developer to provide additional available information. The screening process relating to applications for new renewable energy plants shall be finalised within 45 days from the date of submission of sufficient information necessary for that purpose. However, in the case of applications for installations with an electrical capacity of less than 150 kW and new applications for the repowering of renewable energy power plants, the screening process shall be finalised within 30 days. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 5. Following the screening process, the applications referred to in paragraph 3 of this Article shall be authorised from an environmental perspective without requiring any express decision from the competent authority, unless the competent authority adopts an administrative decision, setting out due reasons on the basis of clear evidence, to the effect that a specific project is highly likely to give rise to significant unforeseen adverse effects in view of the environmental sensitivity of the geographical area where the project is located that cannot be mitigated by the measures identified in the plans designating acceleration areas or proposed by the project developer. Such decisions shall be made publicly available. Such renewable energy projects shall be subject to an environmental impact assessment pursuant to Directive 2011/92/EU and, if applicable, to an assessment pursuant to Directive 92/43/EEC, which shall be carried out within six months of the administrative decision identifying a high likelihood of significant unforeseen adverse effects. Where duly justified on the grounds of extraordinary circumstances, that six-month period may be extended by up to six months. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 In the event of justified circumstances, including where needed to accelerate the deployment of renewable energy to achieve the climate and renewable energy targets, Member States may exempt wind and solar photovoltaic projects from such assessments.
Where Member States exempt wind and solar photovoltaics projects from those assessments, the operator shall adopt proportionate mitigation measures or, where such mitigation measures are not available, compensatory measures, which, if other proportionate compensatory measures are not available, may take the form of monetary compensation, in order to address any adverse effects. Where those adverse effects have an impact on species protection, the operator shall pay a monetary compensation for species protection programmes for the duration of the operation of the renewable energy plant in order to ensure or improve the conservation status of the species affected. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16a CELEX: 02018L2001-20240716 6. In the permit-granting procedure referred to in paragraphs 1 and 2, Member States shall ensure that the lack of reply by the relevant competent authorities within the established deadline results in the specific intermediary administrative steps to be considered as approved, except where the specific renewable energy project is subject to an environmental impact assessment pursuant to paragraph 5 or where the principle of administrative tacit approval does not exist in the national legal system of the Member State concerned. This paragraph shall not apply to final decisions on the outcome of the permit-granting procedure, which shall be explicit. All decisions shall be made publicly available. |