Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16d CELEX: 02018L2001-20240716 Permit-granting procedure for the installation of solar energy equipment
1. Member States shall ensure that the permit-granting procedure referred to in Article 16(1) for the installation of solar energy equipment and co-located energy storage, including building-integrated solar installations, in existing or future artificial structures, with the exclusion of artificial water surfaces, shall not exceed three months, provided that the primary aim of such artificial structures is not solar energy production or energy storage. By way of derogation from Article 4(2) of and Annex II, points 3(a) and (b), alone or in conjunction with point 13(a), to Directive 2011/92/EU, such installation of solar equipment shall be exempt from the requirement, if applicable, to carry out a dedicated environmental impact assessment pursuant to Article 2(1) of that Directive.
Member States may exclude certain areas or structures from the application of the first subparagraph for the purpose of protecting cultural or historical heritage, national defence interests, or safety reasons. |
Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) (Text with EEA relevance.) article 16d CELEX: 02018L2001-20240716 2. Member States shall ensure that the permit-granting procedure for the installation of solar energy equipment with a capacity of 100 kW or less, including for renewables self-consumers and renewable energy communities, shall not exceed one month. The lack of reply by the competent authorities or entities within the established deadline following the submission of a complete application shall result in the permit being considered as granted, provided that the capacity of the solar energy equipment does not exceed the existing capacity of the connection to the distribution grid.
Where the application of the capacity threshold referred to in the first subparagraph leads to a significant administrative burden or to constraints to the operation of the electricity grid, Member States may apply a lower capacity threshold provided that it remains above 10,8 kW. |