Explore European Union Legislation by Asking a Legal Question
assisted-checkbox
filter-instruction-1
positive-filters
negative-filters
act-filter tabs-all
parameters-title
query
assisted-checkbox: ✅
result-title
total 2
Regulation (EU) 2024/1735 of the European Parliament and of the Council of 13 June 2024 on establishing a framework of measures for strengthening Europe’s net-zero technology manufacturing ecosystem and amending Regulation (EU) 2018/1724 (Text with EEA relevance) article 48 CELEX: 02024R1735-20240628 Amendment to Regulation (EU) 2018/1724
Regulation (EU) 2018/1724 is amended as follows: (1) in Annex I, in the first column, a new row ‘R. Net-zero technology manufacturing projects’ is added; (2) in Annex I, in the second column, in the row ‘R. Net-zero technology manufacturing projects’, the following points are added: ‘1. information on the permit-granting process; 2. financing and investment services; 3. funding possibilities at Union or Member State level; 4. business support services, including but not limited to corporate tax declaration, local tax laws, labour law.’ ; (3) in Annex II, in the first column, a new row ‘Net-zero technology manufacturing projects’ is added; (4) in Annex II, in the second column, in the row ‘Net-Zero technology manufacturing projects’, the following point is added: ‘Procedures for all relevant permits to build, expand, convert and operate net-zero technology manufacturing projects, and net-zero strategic projects, including building, chemical and grid connection permits, environmental assessments and authorisations where required, and encompassing all applications and procedures.’ ; |
Regulation (EU) 2024/1735 of the European Parliament and of the Council of 13 June 2024 on establishing a framework of measures for strengthening Europe’s net-zero technology manufacturing ecosystem and amending Regulation (EU) 2018/1724 (Text with EEA relevance) article 48 CELEX: 02024R1735-20240628 (5) in Annex II, in the third column, in the row ‘Net-Zero technology manufacturing projects’, the following point is added: ‘All outputs pertaining to the procedures ranging from the acknowledgement that the application is complete to the notification of the comprehensive decision on the outcome of the procedure by the designated contact point.’ ; (6) in Annex III, the following point is added: ‘(8) Single points of contact established or designated, pursuant to Article 6(1) of Regulation (EU) 2024/1735 of the European Parliament and of the Council (), including for the purposes of Article 18(1) of that Regulation and contact points established or designated pursuant to Article 33(1) thereof. |