Regulation (EC) No 663/2009 of the European Parliament and of the Council of 13 July 2009 establishing a programme to aid economic recovery by granting Community financial assistance to projects in the field of energy

article  14

CELEX:  02009R0663-20181224

Selection and award criteria
1. In assessing the proposals received under the call for proposals referred to in Article 12(1), the Commission shall apply the following selection criteria:
(a) the soundness and technical adequacy of the approach;
(b) the soundness of the financial package for the full investment phase of the project.
Regulation (EC) No 663/2009 of the European Parliament and of the Council of 13 July 2009 establishing a programme to aid economic recovery by granting Community financial assistance to projects in the field of energy

article  14

CELEX:  02009R0663-20181224

2. In assessing the proposals received under the call for proposals referred to in Article 12(1), the Commission shall apply the following award criteria:
(a) maturity, defined as reaching the investment stage, and incurring substantial capital expenditure by the end of 2010;
(b) the extent to which lack of access to finance is delaying the implementation of the action;
(c) the extent to which the project improves or increases the scale of installations and infrastructures that are already under construction, or are in the planning phase;
(d) the extent to which the project includes the construction of full-size and industrial-scale installations and infrastructures, and addresses in particular the following matters:
(i) the balancing of the variability of wind electricity through integrative systems;
(ii) the existence of large-scale storage systems;
(iii) the management of wind farms as virtual power plants (more than 1 GW);
(iv) the existence of turbines placed further from the shore or in deeper waters (20 to 50 m) than is currently standard;
(v) novel sub-structure designs; or (vi) processes for assembly, installation, operation and decommissioning and testing of these processes in life-size projects;
(e) the innovative features of the project and the extent to which it will demonstrate the implementation of such features;
(f) the impact of the project and its contribution to the Community’s offshore wind grid system, including its replication potential;
(g) the commitment demonstrated by the beneficiaries to disseminate to other European operators the results of technological advances made by the project in a manner compatible with Community law and in particular with the objectives and structures outlined in the Strategic Energy Technology Plan for Europe.